About usContact uswe are Hiring Book Appointment 0 items for Estimate

EXECUTIVE PLUS - 1398

Service code - 1398

Cost - INR 1398/ Sqft of Roof Area

    
  • Features
  • Specifications
  • Sample
  • Terms


Various Bands of typical building for better Earthquake resistance.

Various Bands of typical building for better Earthquake resistance.
Trapezoidal Slope Footing for Foundation.

Trapezoidal Slope Footing for Foundation.
Tie Beam at plinth Band level as per Structural Load Calculations.

Tie Beam at plinth Band level as per Structural Load Calculations.
Use of mechanization for all types of earth work operations, saving precious time and labor efforts.

Use of mechanization for all types of earth work operations, saving precious time and labor efforts.
Brick Masonry with clear Pointing & Racking stable Cross English Bond for better strength.

Brick Masonry with clear Pointing & Racking stable Cross English Bond for better strength.
Periodical curing for gaining requisite strength in time.

Periodical curing for gaining requisite strength in time.
Checking of alignment at all levels to ensure greater accuracy and quality of civil works.

Checking of alignment at all levels to ensure greater accuracy and quality of civil works.
Use of needle vibrator for getting best ever concrete quality.

Use of needle vibrator for getting best ever concrete quality.
Reinforcement tying strict to Bar Bending Schedule generated from Structural details.

Reinforcement tying strict to Bar Bending Schedule generated from Structural details.
Proper hacking and chiseling of plain concrete structure for better grip with plaster.

Proper hacking and chiseling of plain concrete structure for better grip with plaster.
Architectural Plan, 3D Modelling will be free of Cost if Packages selected above 1299.

Architectural Plan, 3D Modelling will be free of Cost if Packages selected above 1299.
Compulsory Anti-Termite Treatment for all site.

Compulsory Anti-Termite Treatment for all site.
Compulsory Waterproofing at various level casting and after casting.

Compulsory Waterproofing at various level casting and after casting.
Architrave groove in door and window frame for aesthetic look.

Architrave groove in door and window frame for aesthetic look.
Silicon fillers for the space around the Door and window frames. It eliminates the chances of Hairli

Silicon fillers for the space around the Door and window frames. It eliminates the chances of Hairli
A waterproofing grout is essential to check the water capillary action causing dampness to your aest

A waterproofing grout is essential to check the water capillary action causing dampness to your aest
Filling the gaps with appropriate waterproofing compound which do match the bathroom tile color.

Filling the gaps with appropriate waterproofing compound which do match the bathroom tile color.
An innovative way by providing one way slope in the bathroom to drain out waste water.

An innovative way by providing one way slope in the bathroom to drain out waste water.
Fire Resistant modular switches that raise acoustics of your house.

Fire Resistant modular switches that raise acoustics of your house.
No matter what color you choose we give the best of weather proof exterior coat that lasts long.

No matter what color you choose we give the best of weather proof exterior coat that lasts long.

Sl.

ITEM DESCRIPTION

PROCEDURE

MATERIAL        (See Sample)

PRE-CONSTRUCTION WORKS

 

Area Mapping

Done by Manual measuring tools and tackles or by Total Station

N/A

 

Architectural Plan

Preparation of Layout Plan, Column Centre Line Plan, D/W Schedule

N/A

 

Structural Design

Preparation of Footing Details, Column Schedule, All Beam Details, Roof Slab  Details, All BBS & other critical designs if required.

N/A

 

3D VIEWS

Preparation of 3D Elevation Views from 3 Sides

N/A

CORE STRUCTURE

 

Earth work in ambient Soil conditions (Hard Strata found within a depth of 2Mtr) with in 25 Mtr Initial Lead and 2 Mtr Initial Lift, including Rough Dressing.

Excavation Up to Size 5' X 5' X 4' or less as per Structural Requirements, done manually or by mechanical Means.

N/A

 

Earth work in Loose soil conditions (Hard Strata found beyond a depth of 2 Mtr) with in 25 Mtr Initial Lead and 2 Mtr Initial Lift, including Rough Dressing

Pilling up to suitable depth using Auger Boring technique. 10" Manual Excavation above blunt pile heads. N.B: Pilling Works shall be charged Extra including labour and Material Charges as on actual.

PPC Cement

Sand

Coarse Aggregates

 

Sand Filling

4" Filling of Sand including watering & Ramming done Manually or Mechanically.

Sand

 

PCC

4" PCC (1:4:8) Concreting and then Placing of Column Reinforcement over single or double layered reinforcement mat all as per BBS & CS.

PPC Cement

Coarse Sand

Coarse Aggregates

 

RCC Footing and Column up to Plinth Level. N.B: Up to 2' above existing average ground level is covered under the package above that shall be charged extra.

Trapezoidal Footing or Pedestal concreting over pile cap as per foundation plan and structural Requirement, Checked & verified by Structural Consultant.

PPC Cement

TMT Steel

Sand

Coarse Aggregates

 

Masonry Work up to bottom of Plinth beam

Manual Excavation up to 1' below existing Ground Level. 100 mm Sand Filling & 100 mm PCC (1:4:8). Stone masonry work.

PPC Cement

Sand

Coarse Aggregates

Laterite Stone

 

Backfilling (Up to Plinth Level)

N.B: Up to 2' above existing average ground level is covered under the package above that shall be charged extra.

Watering and compacting up to required Density. Up to 2' Above Existing Avg. Ground Level.

Locally Available Backfilling Materials

 

Tie Beam

Reinforcement, Beam side Shuttering and concreting As per structural Requirement, Checked by Structural Consultant.

PPC Cement

TMT Steel

Sand

Coarse Aggregates

 

Water Proofing

Compound mix with mortar for plaster & Punning work below plinth as per Manufacturer Specification.

Water Proofing Compound

 

Anti Termite Treatment

Compound mix with water gently sprayed at plinth level before flooring as per Manufacturer Specification

Anti-Termite Chemical (Str)

 

Plinth level Sand filling and Floor PCC

6" Sand Filling, watering and Ramming

4" PCC (1:4:8) Concreting keeping proper Slope Gradient

PPC Cement

TMT Steel

Sand:

Coarse Aggregates

 

Column (Up to Lintel Level)

Shuttering, reinforcement & Casting of Column As per structural Requirement, Checked and Verified by Structural Consultant.

PPC Cement

Steel

Sand: River Sand

Coarse Aggregate

 

Brick Masonry (Up to Lintel Level)

Brick Masonry of 250 mm thick for external wall &  125 mm thick for Partition wall.

Cement

Sand: River Sand

Standard Fly Ash Bricks

 

Sill Level Casting in case of Windows

Shuttering, reinforcement & Casting with Minimum Projection of 125 mm and bearing As per structural Requirement, Checked by Structural Consultant. Height ranging from 0.75 - 0.90 mtr.

PPC Cement

TMT Steel

Sand: River Sand

Coarse Aggregate

 

Lintel Level Casting

N.B: Cut Size in case of Openings is covered in this package.

Shuttering, reinforcement & Casting in cut size with and bearing As per structural Requirement, Checked by Structural Consultant.

PPC Cement

TMT Steel

River Sand

Coarse Aggregate

 

External Projection

Shuttering, reinforcement & Casting with external Projection ranging from  of 250- 300 mm and bearing As per structural Requirement, Checked by Structural Consultant.

PPC Cement

TMT Steel

Sand: River Sand

Coarse Aggregate

 

Brick Masonry (Up to Slab Level)

Brick Masonry of 250 mm thick for external wall &  125 mm thick for Partition wall.

PPC Cement

River Sand

Standard Fly Ash Bricks

 

Slab less Stair Case

Shuttering, hook type reinforcement and casting with Tread Size 250 mm X 1200 mm and Minimum Riser Height of 150 mm. As per structural Requirement, Checked & Verified by Structural Consultant

PPC Cement

TMT Steel

River Sand

Coarse Aggregate

 

Roof Slab Casting

Shuttering, Reinforcement and casting of Maximum Thickness 115 mm. All as per structural Requirement, Checked by & Verified by Structural Consultant.

Cement

TMT Steel

River Sand

Coarse Aggregate

Conduits: PVC Pipes

 

Same process repeats for subsequent floors.

 

Terrace Head Room: If constructed with RCC structure then rate applicable as per covered Area of Roof. But in case of construction of temporary structure using GI Sheet and MS Sectional Pipe shall be charged extra as on actual.

 

Standard Plaster (Exteriors, Interiors and ceiling)

20 mm Thick for External Side & 15 mm Thick for Internal Side using cement mortar 1:6.     6 mm Thick for Ceiling using Cement Mortar 1:4

PPC Cement

Sand: River Sand

 

Design Plaster

(N.B: Any type of external elevation design shall be charged Extra.)

PPC Cement

Sand: River Sand

 

Low Roofs (Internal)

(N.B: Except Kitchen Counter Top any other type of Low roof construction shall be charged Extra.)

PPC Cement

TMT Steel

Sand

Coarse Aggregates

OPENINGS & EDGE PROTECTION

 

Door Frames

Door Frame Fixing using holdfast As per Door & Window Schedule Specifications with maximum opening size of 1000 mm X 2100 mm. Max. Thickness of Frame shall be 2.5" and width shall be 4".

Door Frame:

Seasoned Sal Wood Painted, Solid FRP Frame, WPC Frame.

 

Window Frames

Window Frame Fixing As per Door & Window Schedule Specifications with Maximum opening size of 1200mm X 1300mm. Thickness of Frame shall be 2.5" and width shall be 4".

Window Frame :

Seasoned Sal Wood Painted, Solid FRP Frame, WPC Frame, UPVC Frame, Powder Coated Aluminium Frame.

 

Main Door

Maximum one unit per floor. Double shutter of Size as per Door & Window Schedule Specifications and Design Selected from the Sample.

Designer type of Seasoned  Wood  with PUor Melamine Polish

 

Main Door Fittings and Fixtures

Door Fixed with 3 Butt Hinge, 1 Aldrop Bolt, 2 Latch, 1 Tower Bolt, 2 Bow Handle, Mortise Lock, Door Stopper, PVC Buffer & Door Viewer.

Brass/ SS/ Aluminium Fittings  (N.B: Only 1 Side Brass Fittings Set for each Main Door is Covered.)

 

Individual Room Doors

Single Shutter of size as per Door & Window Schedule Specifications and Design Selected from the Samples.

Membrane Doors/

Fibre Doors /Seasoned Wood

 

Individual Room Door Fittings & Fixtures

Door Fixed with 2 Butt Hinge, 1 Aldrop Bolt, 2 Latch, 1 Tower Bolt, 2 Bow Handle, Mortise Lock, Door Stopper, PVC Buffer & Door Viewer. As per Door & Window Schedule Specifications.

SS/ Aluminium Fittings

 

Window

Sliding/ Double Casement As per Door & Window Schedule Specifications and Design Selected from the Samples.

Composite Wood- Glass /Composite Powder Coated Aluminium Sliding Window with 5mm Dark Glass

 

Window Fittings and Fixtures

Window Fixed with 2 Butt Hinge, 2 Tower Bolt, 1 Bow Handle, 1 Wind Window Hook or Window Closure & Door Viewer.

SS/ Aluminium/ PVC Fittings

 

Bathroom Ventilator

Horizontally Pivoted or Louvered type ventilator of size as per Door & Window Schedule Specifications and designs selected from the samples.

Composite Wood- Glass /Composite Powder Coated Aluminium with 5mm Dark Glass

 

MS Grills for all Window/ Ventilator Openings

Either fixed using holdfast or screwed permanently across supporting structure. Design & enamel painted as selected  from sample.

MS Section Grill painted with 1 coat Primer + 2 Coat enamel paint.

 

Other Openings

Sky light, AC Vent/ Gas Vent etc.

Composite MS Section + Glass/ Designer Precast

 

Balcony/ Stair Case Railing

Fixed with Anchor Bolts, Maximum Triple Layer and fixed type. Maximum Height shall be 3'2".

Stainless Steel/ Mild Steel Painted.

FLOORING & PAINTING

 

Paint (Interiors)

2 Coat Wall Putty + 1 Coat primer + 2 Coat Paint. Water paint ratio as per manufacturer guideline

Wall Putty

Primer

Paint

 

Paint (Exteriors)

1 Coat primer + 2 Coat Weather Proof Paint. Water paint ratio as per manufacturer guideline

Primer

Paint

 

Flooring for All Rooms/ Balconies

Mortar placing (1:6), cement Slurry Spreading, tile fixing and grout finish keeping zero slope gradient. Materials selected from Sample.

2' x 2' Vitrified Tiles

PPC Cement, Sand, Grouting Compound (Matching Tile Colour)

 

Bathroom Flooring

Mortar placing (1:6), cement Slurry Spreading, tile fixing and joint grout finish keeping slope gradient towards outlet drain. Materials selected from Sample.

2' x 2' Ceramic Tiles

PPC Cement, Sand, Grouting Compound (Matching Tile Colour)

 

Bathroom and Kitchen Wall Tiling

Mortar placing (1:6), cement Slurry Spreading, tile fixing and joint grout finish keeping zero slope gradient Materials selected from Sample. Maximum Up to 6' Height

8" x 12" Wall Tiles, PPC Cement, Sand, Grouting Compound (Matching Tile Colour)

 

Staircase Flooring

Mortar placing (1:6), cement Slurry Spreading, fixing and joint grout finish keeping zero slope gradient Materials selected from Sample.

Non Polish Marble/ Granite

 

Kitchen Counter Top

Mortar placing (1:6), cement Slurry Spreading, fixing and joint grout finish keeping zero slope gradient Materials selected from Sample.

Granite Counter Top

PLUMBING

 

N.B: In each floor area ranging from 1000 Sqft to 2500 Sqft area, 1 Toilet, 1 Bathroom, 1 Kitchen, 1 Wash Basin are Covered.

 

Common Toilet

Equipped with P Trap 1 Sitting Type Wall Hung Closet or1 20" Squatting Pan with outdoor PVC cistern unit (45 x 13 x 30.2 cm), 1 Wall Hung Basins, 1 Pillar Cock (Foam Flow) Faucet, 1 wall mixer (2 in 1) with provision for overhead shower, Single Flow Overhead shower,1 Bib Cock Faucet

All branded sanitary wares and faucets

 

Attached Bathroom

Equipped with P Trap 1 Sitting Type Wall Hung Closet or1 20" Squatting Pan with outdoor PVC cistern unit (45 x 13 x 30.2 cm), 1 Health Faucet, 1 Wall Hung Basins, 1 Pillar Cock (Foam Flow) Faucet, 1 wall mixer (3 in 1) with provision for overhead shower and hand shower, 1 200mm Rain shower, 1 Three Flow Hand Shower (150 mm), 1 Bib Cock Faucet

All branded sanitary wares and faucets

 

Common Accessories

1 Soap Dish Holder, Towel Bar & Bathroom Mirror

All branded accessories

 

Kitchen

1 SS Single Bowl Kitchen Sink, Sink Cock with normal swivel spout table/ wall mounted Faucet

All branded sink and faucet

 

Wash Basin

1 Single lever Basin Mixer, 1 Full Pedestal or Half Pedestal or Table top Designer Basins.

All branded sanitary wares and faucet.

 

Plumbing Pipes Layout

Laying out as per  Specifications

UPVC Pipes, Joint Glue

 

Sanitary and Rain water Pipeline

One pipe system laying out as per  Specifications

PVC Pipes, Joint Glue

ELECTRICAL

 

Electrical Conduiting

Laying out of Conduit pipes and installation of Fan Box all as per  Specifications

PVC Pipe

 

Electrical Wiring

As per  Specifications

Insulated Copper PVC Cable.

 

Switch Points, Bulb Points, Fan Point

All main points equipped with 6 Switch, 1 5A/15A Socket, 1 Regulator, Single Switch points with 5A/ 15 A Points  all as per  Specifications

Branded Modular Switches and points

 

MAIN DISTRIBUTION PANEL

All points connected to the main distribution box with individual room MCB switch

Branded Modular MCB panel Box

 

N.B: In each floor a maximum of 2 nos of 15A Socket and 8 Nos 5A Socket are covered. Earthing wire is covered under the package but installation of Earthing System is charged extra as on actual.

Architecture Plan

55' X 32' Built Up Area

56' X 24' Built Up Area

Odd size Built Up Area
Cement

Birla Gold Cement

Zuari Cement

Ramco Cement

Mahashakti Cement
Steel

Kamdhenu TMT Steels

SCAN TMT Steels
Raw Materials

Fly Ash Bricks 10"X5"X4"

Sand Coarse/ Finer

Coarse Aggregate Size 20mm/40mm
Door &Window

Engineered/ Teak Wood Door

Solid FRP Door

Engineered Wood Glass Composite or Powde

UPVC WINDOW

Solid FRP Door

Engineered/Teak Wood Door
Door Fittings

Mortice Lock Set Golden Alloy

Mortice Lock Set Zinc Coated

SS Door Aldrop

Brass Aldrop

Brass Aldrop

Brass Aldrop

Brass Tower Bolt

Door Stopper

SS Door Handle

SS Tower Bolt

Door Stopper

Door Viewer
Openings and Edge Protection

SS + Glass Composite Railing

SS + Glass Composite Railing
Paints

Asian Paints Apcolite

Asian Paints Weather Coat

Asian Wall Putty

Birla Wall Care Putty
Vitrified Tiles/ Ceramic Tiles

Marble

Marble

Green Marble

Marble

Kajaria Ceramic Tiles
Faucet

Jaquar Overhead Shower 150X150MM

Jaquar Health Faucet

Jaquar Hand Shower 80X40MM Rectangular

JaquarPillar Cock

Jaquar Silver Brass Chrome Sink Cock

JaquarPillar Cock

Jaquar Silver Brass Single Sink Cock

JaquarPillar Cock

JaquarBib Cock

Jaquar3 in 1 Mixer
Closet and Squat Pan

Cera Wall Hung Campbell

Cera Wall Hung Cameo

Hindware Orissa Pan
Wash Basin and Sink

Cera Counter Top Oval

Cera Counter Top Oval

Double Bowl Kitchen Sink
Sanitary & Plumbing Pipes cum fittings

Supreme UPVC & CPVC Pipes

Astral UPVC & CPVC Pipes
Electrical wires & Fixtures

Finolex Cables & Wires

Legrand Switches & Fixtures

Cona Switches & Fixtures

ADDITIONAL OFFERS (FOR COMBO PACK ONLY)

  1. 1.5cm thick grading mortar (1:4) over roof slab using river sand and PPC Cement.
  2. Parapet wall of 5" Thick and height up to 2'5" finished with standard finishing by using Fly Ash Bricks, PPC Cement, River Sand and Weatherproof Coat.
  3. RCC Loft or Low Roof of 3" Thickness (Maximum up to 25Sqft Area) with standard finishing using designed Reinforcement, PPC Cement, River Sand and Coarse Aggregate of 20 mm Size.
  4. Box type Window (Extruded up to 15" from all sides) standard finishing using Fe 500 TMT Steel, PPC Cement, River Sand and Coarse Aggregate of 20 mm Size.
  5. Bio Septic Tank (As per designed Volume) 6. Designer Flooring (As per given options) 
  6. Earthing (Electrode Based or Conventional Type) 
  7. Over Head Tank (Max. 1000 Ltrs.)

Beyond the Scope:

Boundary wall, Main Gate, Septic Tank, Sump for water storage, Ceiling Haller Design, Interior Designs, Landscaping works, Plinth Protection across boundary, Backfilling outside built up area, Backfilling above specified Limit, Front elevations (Deviations from standard Architectural Elevation) and any other installation not mentioned in the list. 

Any  Construction Packages promoted under the brand of Builtify.in are  liable for escalation  in the below mentioned conditions:

  1. Abnormal price escalation (More than 1%) in the mid of project Execution or just after signing of contract due to any political reforms or Natural Catastrophe beyond the control of the Contractor. This condition is applicable for the likes of  Raw Materials, transit Cost, Any Taxes Applicable, Petrol/ Diesel etc. 
  2. In case the Location of site lies or lead  by a very congested neighbourhood or the road leading to the site is not accessible by a minimum 5 MT Load capacity Vehicles. In that case extra 0.5% shall be charged extra on the selected package.
  3. In case there is no space for storage of Bulk Raw Materials with in a lead of 15 Meter from the Work Site then 0.5% is shall be charged extra on the selected package.

General Terms & Conditions:

  1. That in consideration of the payment by the owners to the contractor as per rate accepted by the contractor as herein after mentioned, the contractor hereby covenants with the owners to construct and complete work (core house) in the respect in conformity with the provisions of the contract within 8 months from the execution of this agreement.
  2. The contractor will not vary or deviate from the plans and specification without obtaining prior permission in writing of the owners.
  3. The contractor shall repair defects, shrinkage cracks or other faults that may appear in the work within six months after their completion.
  4. Both the parties agree by mutual consent that any dispute relating to this agreement is barred from arbitration. All problems shall be mutually and the decision of owners shall be final and binding on the contractor.
  5. In the event of any dispute that may arise out of this assessment the competent courts situated at Bhubaneswar shall have the authority to decide ad dispose of such dispute/ litigation between parties hereto.
  6. The measurement should be as per the roof area of the building.
  7. Any hindrances of payment made as per schedule by the party during execution or completion of the portion of the work. The work will be stopped until fulfilment of the condition made in the mode of payment.
  8. Increase work program deviate due to natural calamities and any other disturbances by miscreants or scarcity of material or labour strike.
  9. In case the work delayed due to non-payment of the bill in time the contractor will not be responsible.
  10. The work will be required to be completed within a period of 15 Calendar Months from the date of signing of the agreement, provided the payment will be made as per the condition of the mode of payment.
  11. The owners of the property have to be provided with electricity supply to the construction side during the execution of the work at their own cost.
  12. Payment will be made by cheque/ Cash as per work in progress and no escalation of price within the construction period.

GreenAdd-ons (Select from any one)

  1. Kitchen Garden (5’x 2’) with selective plant.
  2. Motion Sensor Light for your Garage (Kawachi Cordless Motion Activated Sensor Light Wall Lamps 360 Degree 6V 7 LEDs Rotation Light)
  3. Power Saver Device
  4. BEE 5 Star Rating Ceiling Fan 1 UNIT
  5. Power Saver Device

 

Copyright Oddaka Infratech (P) Ltd.
Design by CS web soluton
A Product of Oddaka Infratech (P) Ltd.                         Registered under Ministry of Corporate Affairs