PACKAGE FINISH - 499

Service code - 499

    
  • Features
  • Specifications
  • Sample
  • Terms

Sl.

ITEM DESCRIPTION

PROCEDURE

MATERIAL

(See Sample)

OPENINGS & EDGE PROTECTION

 

Door Frames

Door Frame Fixing using holdfast As per Door & Window Schedule Specifications with maximum opening size of 1000 mm X 2100 mm. Max. Thickness of Frame shall be 2.5" and width shall be 4".

Door Frame:

Precast Frame (Cement Punned Finish & Painted) or Material With equivalent cost. (Max Price. 80/- Per Rft)

 

Window Frames

Window Frame Fixing As per Door & Window Schedule Specifications with Maximum opening size of 1200mm X 1300mm. Thickness of Frame shall be 2.5" and width shall be 4".

Window Frame:

Precast Frame (Cement Punned Finish & Painted) or Material with equivalent cost. (Max. Price INR. 80/- Per Rft)

 

Main Door

Maximum one unit per floor. Single shutter of Size as per Door & Window Schedule Specifications and Design Selected from the Sample.

Designer type of Seasoned Wood with lac Polish.        (Max Price 150/ Sqft.)

 

Main Door Fittings and Fixtures

Door Fixed with 3 Butt Hinge, 1 Aldrop Bolt, 2 Latch, 1 Tower Bolt, 2 Bow Handle, Door Stopper, PVC Buffer & Door Viewer.

SS Fittings only for all doors

 

Individual Room Doors

Single Shutter of size as per Door & Window Schedule Specifications and Design Selected from the Samples.

Membrane Doors/

Fibre Doors /Seasoned Wood (Max Price 130/ Sqft.)

 

Individual Room Door Fittings & Fixtures

Door Fixed with 2 Butt Hinge, 1 Aldrop Bolt, 2 Latch, 1 Tower Bolt, 2 Bow Handle, Mortise Lock, Door Stopper, PVC Buffer & Door Viewer. As per Door & Window Schedule Specifications.

SS/ Aluminium Fittings

 

Window

Sliding/ Double Casement As per Door & Window Schedule Specifications and Design Selected from the Samples.

Composite Wood- Glass /Composite Powder Coated Aluminium Sliding Window with 5mm Dark Glass        (Max Price 130/ Sqft.)

 

Window Fittings and Fixtures

Window Fixed with 2 Butt Hinge, 2 Tower Bolt, 1 Bow Handle, 1 Wind Window Hook or Window Closure & Door Viewer.

SS/ Aluminium/ PVC Fittings

 

Bathroom Ventilator

Horizontally Pivoted or Louvered type ventilator of size as per Door & Window Schedule Specifications and designs selected from the samples.

Composite Wood- Glass /Composite Powder Coated Aluminium with 5mm Dark Glass (Max Price 100/ Sqft.)

 

MS Grills for all Window/ Ventilator Openings

Either fixed using holdfast or screwed permanently across supporting structure. Design & enamel painted as selected  from sample.

MS Section Grill painted with 1 coat Primer + 2 Coat enamel paint.

 

Other Openings

Sky light, AC Vent/ Gas Vent etc.

Composite MS Section + Glass/ Designer Precast

 

Balcony/ Stair Case Railing

Fixed with Anchor Bolts, Maximum Triple Layer and fixed type. Maximum Height shall be 3'2".

MS Section painted with 1 coat Primer + 2 Coat enamel paint.

FLOORING & PAINTING

 

Paint (Interiors)

2 Coat Wall Putty + 1 Coat primer + 2 Coat Paint. Water paint ratio as per manufacturer guideline

Wall Putty

Primer

Paint

 

Paint (Exteriors)

1 Coat primer + 2 Coat Weather Proof Paint. Water paint ratio as per manufacturer guideline

Primer

Paint

 

Flooring for All Rooms/ Balconies

Mortar placing(1:6), cement Slurry Spreading, tile fixing and grout finish  keeping zero slope gradient. Materials selected from Sample.

2' x 2' Vitrified Tiles

PPC Cement, Sand, Grouting Compound (Matching Tile Colour) (Max Price 45/ Sqft.)

 

Bathroom Flooring

Mortar placing(1:6), cement Slurry Spreading, tile fixing and joint grout finish  keeping slope gradient towards outlet drain. Materials selected from Sample.

2' x 2' Ceramic Tiles

PPC Cement, Sand, Grouting Compound (Matching Tile Colour) (Max Price 45/ Sqft.)

 

Bathroom and Kitchen Wall Tiling

Mortar placing(1:6), cement Slurry Spreading, tile fixing and joint grout finish  keeping zero slope gradient Materials selected from Sample. Maximum Up to 6' Height

8" x 12" Wall Tiles, PPC Cement, Sand, Grouting Compound (Matching Tile Colour) (Max Price 35/ Sqft.)

 

Staircase Flooring

Mortar placing(1:6), cement Slurry Spreading, fixing and joint grout finish  keeping zero slope gradient Materials selected from Sample.

Non Polish Marble/ Granite (Max Price 85/ Sqft.)

 

Kitchen Counter Top

Mortar placing(1:6), cement Slurry Spreading, fixing and joint grout finish  keeping zero slope gradient Materials selected from Sample.

Granite Counter Top

(Max Price 85/ Sqft.)

PLUMBING

 

N.B: In each floor area ranging from 1000Sqft to 2500 Sqft area, 1 Toilet, 1 Bathroom, 1 Kitchen, 1 Wash Basin are Covered.

 

Common Toilet

Equipped with S Trap 1 Sitting type Coupled Closet or1 20" Squatting Pan with outdoor PVC cistern unit (45 x 13 x 30.2 cm), 1 Pillar Cock Faucet, 1 Bib Cock Faucet, Single Flow Overhead shower,1 Bib Cock Faucet

Sanitary wares and faucets

 

Attached Bathroom

Equipped with S Trap 1 Sitting type Coupled Closet or1 20" Squatting Pan with outdoor PVC cistern unit (45 x 13 x 30.2 cm), 1 Wall Hung Basins, 1 Pillar Cock Faucet, 1 Bib Cock Faucet, Single Flow Overhead shower,1 Bib Cock Faucet

Sanitary wares and faucets

 

Common Accessories

1 Soap Dish Holder, Towel Bar & Bathroom Mirror

Fittings

 

Kitchen

1 SS Single Bowl Kitchen Sink18''x16''x7'', Sink Cock with normal swivel spout table/ wall mounted Faucet.

Sink and faucet

 

Wash Basin

1 Pillar Cock &1 Wall Hung Wash Basin.

All branded sanitary wares and faucet.

 

Plumbing Pipes Layout

Laying out as per Specifications

UPVC Pipes, Joint Glue

 

Sanitary and Rain Water Pipeline

One pipe system laying out as per Specifications

PVC Pipes, Joint Glue

ELECTRICAL

60.

Electrical Conduiting

Laying out of Conduit pipes and installation of Fan Box all as per MEP Specifications

PVC Pipe

61.

Electrical Wiring

As per MEP Specifications

Insulated Copper PVC Cable.

62.

Switch Points, Bulb Points, Fan Point

All main points equipped with 6Switch, 1 5A/15A Socket, 1 Regulator, Single Switch points with 5A/ 15 A Points all as per MEP Specifications

Branded Modular Switches and points

63.

MAIN DISTRIBUTION PANEL

All points connected to the main distribution box with individual room MCB switch

Branded Modular MCB panel Box

64.

N.B: In each floor a maximum of 2 nos of 15A Socket and 8 Nos 5A Socket are covered. A earthing wire is covered under the package but installation of Earthing System is charged extra as on actual.

Door &Window

Wooden Moulded Door

PVC Door for Bathroom

Wood Glass Composite or Aluminium Glass
Door Fittings

SS Aldrop

SS Latch and Tower Bolt

SS and Rubber Door Stopper
Openings and Edge Protection

Staircase Railing

Balcony Railing
Openings Grills

Window Grill

Window Grill

Window Grill

Balcony Railing
Paints

Berger Distemper Bison

Exterior Kamdhenu Weather Supreme Paint

Interior Kamdhenu Rich Paint
Vitrified Tiles/ Ceramic Tiles

Single Color Kajaria Tiles
Faucet

Kamal Step Long Body Brass Bib Cock

RensonSapphireLongBodyCock

Sheetal190liliva Bib Cock Long Body

Rocio Pillar Cock Fittings

Rocio Pillar Cock Fittings

Selfee Black Polypropylene Shower Head

Rocio Long Body Bib Cock

Renson Sapphire Pillar Cock

Duke Silver Brass Pillar Cock
Closet and Squat Pan

CERA EWC Conventional S Trap

Parryware C0278 Elite Floor Mounted Euro

Kallangadi Stones White Ceramic Toilet

Hindware Complete Set EwcPapular P (Ivor
Wash Basin and Sink

CERA WashBasinCalvin-2815

VmlSingleSinkForKitchen-18''x16''x7''
Pipes and Fittings

UPVC Fittings

UPVC Fittings

UPVC Fittings

Hariplast PVC Sanitary & Plumbing Pipes

RR Kabel Cables & Wires

Great White Switches & Fixtures

EXTRA WORKS

Roof Grading, Boundary wall, Main Gate, Septic Tank (Bio Digester Tank worth Rs 30,000 is free of cost), Soak Pit, Reed Bed, Sump for water storage, Ceiling Haller Design,Interior Designs, Landscaping works, Plinth Protection across boundary, backfilling outside built up area, backfilling above specified Limit, Front elevations (Deviations from standard Architectural Elevation) and any other installation not mentioned in the list.

 

Any Construction Packages promoted under the brand of Builtify.in are liable for escalation in the below mentioned conditions:

  •  Abnormal price escalation (More than 1%) in the mid of project Execution or just after signing of contract due to any political reforms or Natural Catastrophe beyond the control of the Contractor. This condition is applicable for the likes of Raw Materials, transit Cost, Any Taxes Applicable, Petrol/ Diesel etc. 
  •  In case the Location of site lies or lead by a very congested neighbourhoodor the road leading to the site is not accessible by a minimum 5 MT Load Capacity Vehicles. In that case extra 0.5% shall be charged extra on the selected package.
  • In case there is no space for storage of Bulk Raw Materials with in a lead of 15 Meter from the Work Site then 0.5% is shall be charged extra on the selected package.

GENERAL TERMS & CONDITIONS

  1. All the packages are applicable for construction done inside Bhubaneswar, Khurdha, Cuttack Revenue area.
  2. That in consideration of the payment by the owners to the contractor as per rate accepted by the contractor as herein after mentioned, the contractor hereby covenants with the owners to construct and complete work (core house) in the respect in conformity with the provisions of the contract within 8 months from the execution of this agreement.
  3. The contractor will not vary or deviate from the plans and specification without obtaining prior permission in writing of the owners.
  4. The contractor shall repair defects, shrinkage cracks or other faults that may appear in the work within six months after their completion.
  5. Both the parties agree by mutual consent that any dispute relating to this agreement is barred from arbitration. All problems shall be mutually and the decision of owners shall be final and binding on the contractor.
  6. In the event of any dispute that may arise out of this assessment the competent courts situated at Bhubaneswar shall have the authority to decide ad dispose of such dispute/ litigation between parties hereto.
  7. The measurement should be as per the roof area of the building.
  8. Any hindrances of payment made as per schedule by the party during execution or completion of the portion of the work. The work will be stopped until fulfilment of the condition made in the mode of payment.
  9. Increase work program deviate due to natural calamities and any other disturbances by miscreants or scarcity of material or labour strike.
  10. In case the work delayed due to non-payment of the bill in time the contractor will not be responsible.
  11. The work will be required to be completed within a period of 15 Calendar Months from the date of signing of the agreement, provided the payment will be made as per the condition of the mode of payment.
  12. The owners of the property have to be provided with electricity supply to the construction side during the execution of the work at their own cost.
  13. Payment will be made by cheque/ Cash as per work in progress and no escalation of price within the construction period.

GreenADDONs(Valid up to 1.1.2017)

  1. Rain Water Recharging Facility (N.B: Cost Partly Covered as per Government Scheme if applicable in your area)
  2. Motion Sensor Light for your Garage
  3. Kitchen Garden (5’x 2’) with selective plant.
  4. One time applying of Bio Sanitizer or digester for your Septic Tank or inspection Chamber.

N.B:You can choose any 1, from the above list. 